LMC Insurance was looking to do a facilities upgrade at their West Des Moines location. Partnering alongside
Neumann Bros, we are remodeling their multi-level office space. To go with a more energy efficient lighting solution we have installed a Lutron system that includes daylight harvesting, power and lighting occupancy sensors. Included in the remodel they are upgrading their structured cabling system from category 5E to Panduit category 6. CECM has worked hand and hand with the LMC IT department ensuring a better solution. It’s been a privilege to work alongside Project Engineer Blake Morgan and Project Foreman Chase Kohler as we strive to complete this project. Our team looks forward to building future relationships with Neumann Bros. and LMC Insurance.
Commonwealth Recruits Interns at Fall Career Fairs
By Alexandra Philipps – HR Generalist | Lincoln, NEBarb Frank and Steve Ercius attend the Fall Career Fair at Arizona State University.Nick Hansen...